Completed

Opera House

Opera House COMPLETED 2019 SCOPE OF WORK Sydney Park Plumbing was chosen to carry out the hydraulics works required to allow for a new mezzanine and bin lift installation in the waste receiving room. Water and waste services and RPZ valves were shut down and relocated, as well as a new cleaners store was installed. …

Opera House Read More »

Manly Hydraulics

Manly Hydraulics COMPLETED 2020 SCOPE OF WORK Installation of 100 meters of 560mm HDPE water mains, valves & pumps. Previous Next

Heatherbrae High School

Heatherbrae High School COMPLETED 2020 SCOPE OF WORK Sydney Park Plumbing was contracted by Murphys Group to install 100 meters of 150mm stormwater drainage,15 stormwater pits as well as roof works and replacement of 2 x 4.5 meters urinals Previous Next

NSW School Program

NSW School Program COMPLETED 2019 – 2020 SCOPE OF WORK Sydney Park Plumbing was contracted by Murphys Group to supply + install over 150+ stormwater pits and install gutters downpipes across NSW to over 20 schools. Previous Next

Rodd Point

Rodd Point COMPLETED 2017 SCOPE OF WORK Water, gas and drainage services installed for an architecturally designed construction